AICRANE has successfully delivered, guided the installation of, and commissioned one 125-ton and one 50-ton double girder overhead crane for a prominent mining enterprise in Uzbekistan. Deployed during the crucial mining construction phase, these heavy-duty cranes are now fully operational, securing the safe and on-schedule installation of core mining machinery, structural assemblies, and ongoing maintenance workflows.
Located in a major industrial zone in Uzbekistan, this mining project is a typical heavy industrial construction site involving large-scale equipment installation and continuous lifting operations.
Heavy and oversized equipment installation: The main processing systems include large crushing and material handling equipment requiring high-capacity lifting.
Continuous lifting activities on site: Multiple installation stages required frequent lifting operations with limited idle time for cranes.
Strict construction schedule: The project followed a fixed commissioning timeline, requiring reliable and stable lifting equipment throughout the construction period.
Multi-zone construction layout: Different workshop spans were used for separate installation tasks, requiring cranes with different lifting capacities for parallel operations.
Based on the project requirements in Uzbekistan, two overhead cranes with different lifting capacities were installed in separate workshop spans to handle different lifting tasks during the construction process.
The 125 ton overhead crane was assigned to the most critical lifting tasks in the mining project, including:
The 50 ton overhead crane complements the main lift crane by executing daily operational and auxiliary tasks, including:
AICRANE provided a comprehensive service package for this project in Uzbekistan, extending beyond manufacturing to intensive on-site installation guidance and system commissioning.
The AICRANE field service team supervised and verified the following mechanical and electrical alignments:
For these heavy-duty cranes, a sequential testing protocol was executed to verify structural integrity and rated capacities:
The successful deployment and testing of the 125t and 50t double girder overhead cranes delivered the following direct operational results for the Uzbekistan mining project:
Stable execution of critical lifting operations: The project achieved uninterrupted lifting support during key installation stages, ensuring consistent construction progress.
Improved overall construction efficiency: Work sequencing and on-site coordination were optimized, reducing downtime between lifting and installation activities.
Reliable continuous performance: Both cranes maintained stable operation under continuous working conditions, providing dependable lifting support throughout the project execution period.
If you are planning a mining, metallurgical, or heavy industrial project, AICRANE can support your engineering requirements with:
Contact AICRANE Today to discuss your project requirements and receive a tailored material handling solution for your facility.
Modern shipbuilding is inherently a challenge of heavy logistics. As mega-vessels and modular construction become…
The safety of precast concrete during handling is determined not only by weight, but more…
In the initial stage of international trade, building trust is the cornerstone of any successful…
In the precast concrete industry, efficient and safe handling of components is a critical step…
In Dammam, Saudi Arabia, a world-renowned precast concrete factory faced a critical expansion challenge: massive…
As metal fabrication plants face unprecedented growth in demand, the pressure on production lines is…