Overhead Crane Projects

2 Ton Underhung Crane Installation in Honduras

2 ton underhung crane with electric chain hoist has been installed in our customer’s workshop. The under running crane is widely used in industrial and mining enterprises, warehouses, stockyards and other places because of its compact structure, good rigidity, sensitive operation, low noise, no pollution, safety and reliability. The crane power supply is 380V 50Hz, and it can also be customized according to customer requirements. In order to facilitate transportation, the main beam, end beams, electric hoist, and trolley are normally decomposed and packaged when they leave the factory, and reassembled during on-site installation.

Get a Free Quote

Underhung Crane Installation Notes

1. Main beam and end beam assembly

There are three shaft holes at both ends and the middle of the end beam. Insert the connecting plate into the gap in the middle of the end beam. After the hole of the connecting plate is aligned with the equal aperture in the middle of the end beam, install the shaft II, and then fix the shaft II with the clamping plate.

2. Electric trolley connected with the end beam

The connection between the trolley and the end beam is completed by the triangular balance beam axis I, M30X1.5 bolts, etc. According to the track width of the trolley, use the adjusting pad to adjust the distance of the inner edge of the wheel to ensure that the inner edge of the wheel is 3~5mm away from the track.

3. Electrical installation

After installing each part, install the electrical appliances and circuits correctly. The metal shells of all electrical equipment on the crane must be grounded effectively, and the crane track shall be used as the ground wire forever.

4. Refer to the instructions for use of electric hoist for installation and commissioning of the lifting mechanism

    Get In Touch

    Our teams are on hand to provide you with the right lifting solutions.

    Recent Posts

    Custom 10 Ton & 40 Ton Overhead Cranes for a Russian Ship Repair Project

    When a major ship repair project in Russia required reliable, high-performance overhead cranes under a…

    2026-01-13

    A Story of Trust: Delivering a 10T Rubber Tyred Gantry Crane in Russia

    In an outdoor yard of a metal fabrication company in Russia, large steel structures needed…

    2026-01-07

    25 Ton Rubber Tyred Gantry Crane Transforms HVAC Handling in the US

    Handling large industrial equipment outdoors is always challenging, especially when dealing with high-value, delicate machinery.…

    2025-12-09

    Efficient Precast Handling in Indonesia: 10 Ton Gantry Cranes

    In Indonesia's rapidly expanding construction industry, a leading precast manufacturer in Surabaya faced production delays…

    2025-11-07

    Tailored Overhead And Gantry Crane Solutions for Mexico’s Sardine Farm

    When a brand-new pier was being built for Mexico's largest sardine farm, the team faced…

    2025-10-28

    Efficient Precast Handling with Mobile Gantry Cranes in Moldova

    A construction company in Chișinău, Moldova, needed efficient lifting solutions for its new precast yard.…

    2025-10-13
    Contact Us
    X Contact Us

      Get In Touch

      Our teams are on hand to provide you with the right lifting solutions.