Overhead Crane Projects

3 Ton Overhead Crane For Steel Pipe Processing Plant in Argentina

Aicrane AQ-LD 3 ton overhead crane is installed in a steel pipe processing plant in Argentina to hoist the produced 6m steel pipes and bars onto trucks for transportation. This single girder overhead crane 3 ton is equipped with single-speed chain hoist, which is very cost-effective and is the most common structure in the local area.

Installation of 3 Ton Overhead Crane in Steel Pipe Processing Plant In Argentina

Argentina 3 Ton Overhead Crane With Chain Hoist

Technical Parameters of The Steel Pipe Processing Plant 3 Ton Overhead Crane

Model AQ-LD single girder overhead crane with single speed chain hoist
Load capacity 3 ton
Span 8m
Lifting height 6m
Work duty A3
Control pendant control + remote control

FAQs About The Argentina 3 Ton Overhead Crane

Why choose Aicrane?

Aicrane has local cooperative customers and extensive installation experience. Under Aicrane’s suggestion, we went to the site of one of Aicrane cooperative clients and were very pleased with it.

The technical team is very professional and all technical issues raised were resolved accordingly.

How long is your delivery time?

The delivery time of our overhead cranes is generally 20~40 working days. For this 3-ton overhead crane, the customer ordered at the end of October and completed the production at the beginning of December. During this period, our customer-service staff updated the production progress with pictures every week.

Which port was the overhead crane shipped from?

The 3 ton overhead crane was shipped from Qingdao Port.

How long is the warranty period of your overhead crane?

The warranty period of the 3 ton overhead crane is 1 year. If any part is damaged or malfunction due to quality problem within 1 year, we will provide free replacement parts.

How to Install the 3 Ton Overhead Crane in Argentina?

The customer installed by themselves. We provided installation videos, installation drawings, etc., and our installation engineers guided the installation online.

According to the installation pictures and video feedback from the customer, the whole installation process went very smoothly. Check out the video of the 3 ton overhead crane installation and commissioning feedback from our customer:

    Get In Touch

    Our teams are on hand to provide you with the right lifting solutions.

    Recent Posts

    Efficient Precast Handling in Indonesia: 10 Ton Gantry Cranes

    In Indonesia's rapidly expanding construction industry, a leading precast manufacturer in Surabaya faced production delays…

    2025-11-07

    Tailored Overhead And Gantry Crane Solutions for Mexico’s Sardine Farm

    When a brand-new pier was being built for Mexico's largest sardine farm, the team faced…

    2025-10-28

    Efficient Precast Handling with Mobile Gantry Cranes in Moldova

    A construction company in Chișinău, Moldova, needed efficient lifting solutions for its new precast yard.…

    2025-10-13

    64 Ton Overhead Crane Boosts Mold Handling Efficiency in Russia

    A leading industrial plant in Saint Petersburg needed a reliable solution for lifting heavy molds…

    2025-09-25

    12.5 Ton RTG Crane: Flexible Precast Slab Handling in Russia

    In St. Petersburg, Russia, our client faced difficulties moving heavy precast concrete slabs as traditional…

    2025-09-05

    32 Ton Overhead Crane for Precision Manufacturing in Costa Rica

    In this project, we helped a leading Costa Rican precision instrument manufacturer overcome a major…

    2025-08-11
    Contact Us
    X Contact Us

      Get In Touch

      Our teams are on hand to provide you with the right lifting solutions.