In a recent project, our company supplied and installed a 10 ton gantry crane for a precast concrete production facility in Indonesia. This crane is used to lift precast concrete components, enhancing their production capabilities and ensuring smooth lifting operations in their facility. The specifications of this crane include: span 18.9 meters, lifting height 5.4 meters, and work duty A3. Find out more details about this crane used for precast concrete production in Indonesia below.

10 Ton Gantry Crane for Precast Concrete Production

10 Ton Gantry Crane in Indonesia

Gantry Crane For Precast Concrete Plant in Indonesia

Gantry Crane for Precast Concrete Production

Gantry Crane Manufacturing For Indonesia: Ensuring Quality

The 10 ton gantry crane for Indonesia was manufactured in our factory with strict adherence to international standards and quality control protocols. Our skilled engineers and technicians utilized state-of-the-art equipment and techniques to ensure that every component of the crane met high quality standards.

Welding and forming of crane parts:

Welding and forming of crane parts

Painting of crane parts:

Painting of crane parts

Crane Delivery to Indonesia: Ensuring Timely and Safe Delivery

The 10 ton gantry crane was well packed and shipped from our factory to Indonesia. Key aspects of the delivery process included:

  • Logistics Planning: We coordinated closely with logistics partners to manage shipping routes and schedules.
  • Safe Handling: The crane components were securely packed to prevent damage during transit.
  • On-time Delivery: We ensured that the 10 ton gantry crane arrived at the site on schedule, ready for installation.

Crane Packaging and Delivery to Indonesia

Crane Installation and Commissioning: Expert Guidance and Training

Upon arrival in Indonesia, our commitment to customer satisfaction continued with comprehensive installation and commissioning services. Aicrane experienced after-sales installation engineer was onsite to oversee the process.

Key aspects of the installation and commissioning process included:

  • Onsite Guidance: Our engineer supervised the assembly of the crane, ensuring that all components were correctly installed and aligned.
  • Commissioning: We conducted thorough testing of the crane’s systems to confirm its proper functionality and safety.
  • Operator Training: To ensure the effective use of the crane, our engineer provided detailed training to the operators. This training covered crane operation, maintenance procedures, and safety protocols.

The crane is now operating smoothly at our customer’s precast concrete production facility, significantly improving their production efficiency and safety. To learn more about our customized lifting solutions for precast concrete production, contact us today.

    Customize Your Lifting Solutions

    Contact us now via email: inquiry15@aicranes.com, or fill in the form below.

    FEW TIPS:

    1.Load capacity: ton?

    2.Span of the crane: m?

    3.Max. lifting height of the crane: m?

    4.What materials will be handled: ?

    5.How many hours will the crane work per day?

    6.Project introduction: project working site, project budget, etc.