Our 5-500 ton overhead crane is designed to handle a wide range of industrial lifting tasks, from light workshop operations to ultra-heavy equipment handling in power plants and shipyards. Whether you are planning a 10 ton bridge crane for a small facility or a 100 ton overhead crane for heavy manufacturing, we provide customized lifting solutions that combine reliable performance, durable construction, and flexible configuration options. Explore the capacity ranges below to find the overhead crane that best fits your application.
5-500 Ton Overhead Crane Capacity Range
5-20 Ton Overhead Cranes for Sale (5, 10, 15 Ton Options)
The 5-20 ton overhead crane range is ideal for small to medium workshops, light manufacturing plants, and warehouse operations. Popular models include 5 ton overhead cranes, 10 ton overhead cranes, and 15 ton overhead cranes, providing reliable lifting for daily material handling and production tasks.
Applications
- Small workshop lifting and assembly
- Equipment maintenance and repair
- Material handling in warehouses
- Light steel and machinery components handling


20-50 Ton Overhead Crane for Sale (20, 25, 30, 40 Ton Options)
The 20-50 ton overhead crane range is commonly used in medium-sized factories, steel plants, and precast concrete workshops. This range covers 20 ton, 25 ton, 30 ton, and 40 ton bridge cranes, offering higher lifting capacity for heavier materials while ensuring safety and efficiency.
Applications
- Steel coil handling in factories
- Precast concrete component lifting
- Medium-duty production line support
- Heavy machinery assembly


50-100 Ton Overhead Crane for Sale (50, 60, 75, 80 Ton Options)
The 50-100 ton overhead cranes are designed for large-scale industrial operations such as steel mills, shipyards, and heavy equipment workshops. This range includes 50 ton, 60 ton, 75 ton, and 80 ton overhead cranes, engineered for reliable performance under high load conditions.
Applications
- Heavy machinery assembly
- Steel and metal material handling
- Shipbuilding and large equipment lifting
- Heavy precast concrete and industrial component handling


100-500 Ton Overhead Crane for Sale (100, 200, 300, 400, 500 Ton Options)
The 100-500 ton overhead crane range is designed for ultra-heavy industrial operations, including power plants, steel mills, and large-scale fabrication workshops. These cranes are custom-engineered to safely lift extremely heavy components, ensuring operational reliability.
Applications
- Large-scale steel structure lifting
- Heavy machinery installation in power plants
- Shipbuilding and dockyard lifting
- Industrial component assembly requiring extreme lifting capacity


From compact 5 ton bridge cranes to ultra-heavy 500 ton models, our overhead cranes meet a wide range of lifting requirements. Built for safety, efficiency, and reliability, each model comes with detailed specifications to help you choose the right crane for your needs.
5-500 Ton Overhead Crane Specifications
Below are the typical specifications for our most popular 5-500 ton overhead crane models. Each model is presented with its key technical parameters, making it easier to find the right crane for your project.
| Technical Parameter of AQ-HD European Standard Single Girder Crane | ||||||
|---|---|---|---|---|---|---|
| Capacity | t | 5 | 10 | 12.5 | 16 | 20 |
| Span | S(m) | 7.5~28.5 | 7.5~28.5 | 7.5~28.5 | 7.5~28.5 | 7.5~28.5 |
| Lifting height | m | 6~18 | 6~18 | 6~18 | 6~18 | 6~18 |
| Lifting speed | m/min | 0.8/5 | 0.8/5 | 0.66/4 | 0.66/4 | 0.53/3.4 |
| Trolley speed | m/min | 2~20 | 2~20 | 2~20 | 2~20 | 2~20 |
| Crane speed | m/min | 3~30 | 3~30 | 3~30 | 3~30 | 3~30 |
| Work duty | A5 | A5 | A5 | A5 | A5 | |
| Track type | P24 | P30 | P30 | P30 P38 | P30 P38 | |
| Technical Parameter of AQ-LD Single Girder Crane | ||||||
|---|---|---|---|---|---|---|
| Capacity | t | 5 | 10 | 16 | 20 | 25 |
| Span | S(m) | 7.5~31.5 | 7.5~31.5 | 7.5~31.5 | 7.5~31.5 | 7.5~25.5 |
| Lifting height | m | 6~30 | 9~30 | 9~30 | 9~30 | 9~30 |
| Lifting speed | m/min | 8(0.8/8) | 7(0.7/7) | 3.5(0.35/3.5) | 3.3(0.33/3.3) | 3(0.3/3) |
| Trolley speed | m/min | 20(30) | 20(30) | 18 | 14 | 16 |
| Crane speed | m/min | 20(30) | 20(30) | 20(30) | 20(30) | 20(30) |
| Work duty | A3~A4 | A3~A4 | A3~A4 | A3~A4 | A3~A4 | |
| Track type | P24 | P24 P30 | P30 P38 | P38 P43 | P38 P43 | |
| Technical Parameter of AQ-QD Double Girder Bridge Crane | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Capacity | t | 5 | 10 | 16 | 20 | 32 | 50 | 75 | 100 | 125 | 160 | 200 | 250 | 300 | 350 | 400 | 450 |
| Span | S(m) | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 13~31 | 13~31 | 13~31 | 13~31 | 13~31 | 13~31 | 13~31 | 13~31 | 13~31 |
| Lifting height | m | 6~16 | 6~16 | 6~16 | 6~16 | 6~18 | 6~16 | 6~20 | 6~20 | 6~20 | 6~22 | 6~20 | 6~20 | 6~24 | 6~24 | 6~24 | 6~24 |
| Lifting speed | m/min | 11.5 | 8.5 | 7.9 | 7.2 | 6 | 6 | 3.9 | 3.1 | 3.9 | 3.5 | 2.6 | 2.2 | 2.4 | 2.2 | 2.6 | 2.1 |
| Trolley speed | m/min | 37.2 | 37.4 | 40.1 | 40 | 37 | 31.3 | 31.3 | 33.6 | 33 | 40 | 32 | 32 | 28 | 28 | 31 | 27 |
| Crane speed | m/min | 70.6 | 70.6 | 74.3 | 75.1 | 64.9 | 58.5 | 61 | 61.8 | 62.3 | 68 | 48 | 50 | 42 | 42 | 45 | 42 |
| Work duty | A3~A7 | A3~A7 | A3~A7 | A3~A7 | A3~A7 | A3~A7 | A3~A7 | A3~A7 | A3~A7 | A3~A7 | A3~A7 | A3~A7 | A3~A7 | A3~A7 | A3~A7 | A3~A7 | |
| Track type | P38 | P38 P43 | P43 | P43 | QU70 | QU80 | QU100 | QU100 | QU100 | QU120 | QU120 | QU120 | QU120 | QU120 | QU120 | QU120 | |
| Technical Parameter of AQ-QDX European Standard Double Girder Crane | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Capacity | t | 5 | 10 | 16 | 20 | 32 | 50 | 75 | 100 | 160 | 200 | 250 | 320 |
| Span | S(m) | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 13~31 | 13~31 | 13~31 | 13~31 | 13~31 |
| Lifting height | m | 6~18 | 6~18 | 6~18 | 6~18 | 6~16 | 6~16 | 6~24 | 6~24 | 6~24 | 6~20 | 6~20 | 6~24 |
| Lifting speed | m/min | 1.07~10.7 | 0.81~8.1 | 0.73~7.3 | 0.58~5.8 | 0.49~4.9 | 0.4~4 | 0.37~3.7 | 0.32~3.2 | 0.25~2.5 | 0.24~2.4 | 0.21~2.1 | 0.2~2 |
| Trolley speed | m/min | 3.3~33 | 3.3~33 | 3.2~32 | 3.2~32 | 3.36~33.6 | 2.9~29 | 2.92~29.2 | 2.9~29 | 2.65~26.5 | 2.5~25 | 2.5~25 | 2.4~24 |
| Crane speed | m/min | 6.8~68 | 6.8~68 | 5.4~54 | 5.4~54 | 5.6~56 | 5.4~54 | 4.8~48 | 5.26~52.6 | 4.67~46.7 | 5.2~52 | 5.2~52 | 4.15~41.5 |
| Work duty | A3~A5 | A3~A5 | A3~A5 | A3~A5 | A3~A5 | A3~A5 | A3~A5 | A3~A5 | A3~A5 | A3~A5 | A3~A5 | A3~A5 | |
| Track type | P38 | P38 P43 | P43 | P43 | QU70 | QU80 | QU100 | QU100 | QU120 | QU120 | QU120 | QU120 | |
| Technical Parameter of AQ-NLH European Standard Electric Hoist Double Girder Crane | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Capacity | t | 5 | 10 | 16 | 20 | 32 | 50 | 63 | 80 |
| Span | S(m) | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 |
| Lifting height | m | 6~18 | 6~18 | 6~18 | 6~18 | 6~18 | 6~18 | 6~18 | 6~18 |
| Lifting speed | m/min | 0.8/5 | 0.8/5 | 0.66/4 | 0.53/3.4 | 0.6/2.6 | 0.4~2.4 | 0.4~2.4 | 0.4~2.4 |
| Trolley speed | m/min | 2~20 | 2~20 | 2~20 | 2~20 | 2~20 | 2~20 | 2~20 | 2~20 |
| Crane speed | m/min | 3~30 | 3~30 | 3~30 | 3~30 | 3~30 | 3~30 | 3~30 | 3~30 |
| Work duty | A5 | A5 | A5 | A5 | A5 | A5 | A5 | A5 | |
| Track type | P30 | P30 P38 | P38 | P38 P43 | P43 | P43 QU70 | QU70 | QU80 | |
| Technical Parameter of AQ-LH Electric Hoist Double Girder Crane | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Capacity | t | 5 | 10 | 16 | 20 | 25 | 32 | 40 | 50 |
| Span | S(m) | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 | 10.5~31.5 |
| Lifting height | m | 6~30 | 9~30 | 9~30 | 9~30 | 9~24 | 9~24 | 9~20 | 9~20 |
| Lifting speed | m/min | 8(0.8/8) | 7(0.7/7) | 3.5(0.35/3.5) | 3.3(0.33/3.3) | 3(0.3/3) | 3(0.3/3) | 2.3(0.23/2.3) | 1.8(0.18/1.8) |
| Trolley speed | m/min | 20(30) | 20(30) | 20(30) | 20(30) | 20(30) | 20(30) | 20(30) | 20(30) |
| Crane speed | m/min | 20(43) | 20(43) | 20(43) | 20(43) | 20(43) | 20(43) | 20(43) | 20(43) |
| Work duty | A3~A4 | A3~A4 | A3~A4 | A3~A4 | A3~A4 | A3~A4 | A3~A4 | A3~A4 | |
| Track type | P30 | P30 P38 | P38 | P38 P43 | P43 | P43 | P43 QU70 | P43 QU70 | |
Note: These tables present typical capacities and parameters for reference. Each crane’s technical specifications and configurations can be tailored to suit unique operational needs and project requirements.
5-500 Ton Overhead Crane Projects
5-20 Ton Projects
20-50 Ton Projects
50-100 Ton Projects
5-500 Ton Overhead Crane Price List
Below is a reference for some of the most common overhead crane capacities, showing typical prices for popular models. These examples help you get a sense of investment before requesting a customized quote
| Type | Model | Common Capacities | Typical Span | Approx. Price (USD) |
|---|---|---|---|---|
| Single Girder | AQ-LD | 5-20 Ton | 7.5m-31.5m | $3,900-$15,400 |
| AQ-HD | 5-20 Ton | 7.5m-31.5m | $7,600-$30,800 | |
| Double Girder | AQ-LH | 10-32 Ton | 10.5m-31.5m | $7,000-$33,600 |
| AQ-NLH | 10-32 Ton | 10.5m-31.5m | $15,400-$56,000 | |
| AQ-QD | 10-50 Ton | 10.5m-31.5m | $14,000-$77,000 | |
| AQ-QDX | 10-50 Ton | 10.5m-31.5m | $18,200-$70,000 |
Note: Prices above are for reference only. Actual cost depends on span, lifting height, work duty, optional features, and customization requirements. For an accurate 5-500 ton overhead crane price, contact our team for a custom quotation.
Tonnes Selection Guide: How to Pick the Right Overhead Crane (5-500 Ton)
Now that you have an idea of the costs for different overhead crane capacities, it’s important to think about which tonnage actually suits your needs. Choosing the right capacity ensures safety, efficiency, and cost-effectiveness while avoiding unnecessary investment.
Assess Maximum Load per Lift
Think about the heaviest items you typically lift, including any rigging. This will help you understand what crane capacity is suitable.
Consider: Do your loads approach the limits of a 5 ton, 20 ton, or 100 ton bridge crane?
Consider Lifting Frequency and Stability
The intensity and repetition of lifts affect crane performance over time.
Consider: Will the crane be used occasionally, several times a day, or continuously?
Allow a Safety Margin
Even when loads are within a certain range, it’s important to think about occasional peaks or heavier items.
Consider: Would selecting a crane slightly above your regular load – such as choosing a 30 ton overhead crane instead of a 25 ton – give more flexibility?
Account for Facility Space and Track Load
Crane capacity is tied to structural requirements. Taller ceilings, stronger runways, and reinforced foundations are needed for higher-tonnage cranes.
Consider: Does your facility allow for the crane capacity you are evaluating?
Factor in Future Growth or Changes
Operations may change, and load requirements may grow over time.
Consider: Would a 50 ton overhead crane cover my current and near-future needs better than a 40 ton crane?
Choosing the right overhead crane tonnage is key to safe, efficient, and cost-effective lifting. By considering your maximum load, lifting frequency, facility constraints, and future growth, you can select a crane that perfectly fits your operations, whether it’s a 5 ton, 50 ton, or 500 ton overhead crane.
Aicrane – Trusted Partner for 5-500 Ton Overhead Bridge Crane Solutions
Selecting the right overhead crane involves more than choosing a tonnage – it requires a supplier with technical expertise, proven safety compliance, and reliable operational support. Here’s how we ensure your investment performs efficiently and safely across the 5-500 ton range:

Expertise in Every Tonnage
From 5 ton light duty cranes to 500 ton heavy duty overhead cranes, we design and supply solutions that fit your operational loads, lifting frequency, and facility constraints. Our experience across industries – workshops, factories, ports, and power plants – means your crane is optimized for efficiency and durability.
Advanced Manufacturing and Quality Control
Our cranes are manufactured in modern facilities with advanced fabrication, welding, and assembly technologies. Strict quality control is applied throughout production to ensure structural reliability and consistent performance. Whether it is a 20 ton bridge crane or a 100 ton overhead crane, our strong manufacturing capabilities and compliance with ISO and CE standards ensure safe, durable, and long-term operation.


Comprehensive Operational Support
Beyond supply, we provide installation guidance, load testing, maintenance, and technical support. This ensures that your crane – whether 5 ton, 50 ton, or 500 ton – operates safely and efficiently throughout its service life, helping you maximize productivity and minimize downtime.
Ready to choose the ideal 5-500 ton overhead crane for your operations? Contact Aicrane experts today for a personalized consultation.
FAQ About 5-500 Ton Overhead Cranes
Do you provide detailed drawings and specifications for 5-500 ton overhead cranes?
How does overhead crane tonnage affect the price?
What factors influence the 10 ton or 50 ton overhead crane price?
How much is a 5 ton overhead crane?
How much does a 10 ton overhead crane cost?
How much is a 20 ton overhead crane?
How do I plan for future tonnage upgrades?
From lighter 5 ton cranes to heavy 500 ton models, choosing the correct 5-500 ton overhead crane allows you to handle every lifting task safely and efficiently. Reach out today to get expert advice and a recommended crane tonnage for your operation.