China Steel Structure

Looking for China steel structure? We can offer exactly what you need. The structure is custom designed and built to suit different project’s specifications. With a wealth of experience in the steel structure design, fabrication and service, we can guide you through your decision and provide a perfect solution for you.

Get A Free Quote

A Project Case of A Chilean Customer

Through the full communication between our engineer and the Chilean customer, we learned about the customer’s actual production conditions and lifting requirements, and provided the customer with the most productive and economical steel structure plant design and AQ-QD 50 ton overhead crane.

What we provide for this customer is a turnkey project, from design, manufacturing, packaging, transportation to installation and acceptance. Our company’s professional after-sales service team provides the client with high-standard and fast after-sales service.

Steel Structure Workshop in Chile
Steel Structure in Chile

Steel Structure Erection
Steel Structure Erection

Steel Structure Construction
Steel Structure Construction

Installation of AQ-QD 50 Ton Overhead Crane
Installation of AQ-QD 50 Ton Overhead Crane

Double Girder 50 Ton Overhead Crane in Chile
50 Ton Overhead Crane in Chile

Types of China Steel Structures for Sale

Steel structure is the most commonly used material to construct industrial buildings. There are two main types for you to choose from:

Heavy steel structure – it is an ideal option to erect industrial buildings as it has high strength, great durability, reliability and the ease of construction. The heavy steel structure can be used for almost all types of building form.

Light steel structure – it is more economical than a heavy steel structure. This structure has light weight, small size and better appearance.

In addition, the structure can be designed and built with single span, double span or multi-span depending on your requirements.

We also offer overhead cranes ranging from small capacity light duty overhead cranes to large capacity heavy duty overhead cranes to fit your facility.

Heavy Steel Structure Construction China
Heavy Steel Construction China

Single-span Steel Structure Building for Sale
Single-span Steel Structure Building China

Two-story Steel Structure Buildings Manufacturer
Two-story Steel Structure Buildings China

Get A Free Quote

Wide Applications of Steel Construction

Most industries require workshops, warehouses or sheds to manufacture, repair and store goods. These buildings vary in sizes that can be from small to extremely large.

  • Industrial workshops: the heavy duty China steel structure workshop need to be made with precision as there may be heavy equipment used inside the building, such as overhead cranes.
  • Industrial warehouses: the China steel structure warehouse can be designed and constructed with the right dimensions and features according to your requirements. The buildings can be used for storing or distributing materials.
  • Industrial sheds: different types of structural steel China can be used to design and construct sheds. The China steel structure shed is designed for various purposes, such as processing, storing or distributing materials.

Steel Structure for Sheds
China Steel Shed Structure

China Steel Structure With 10 Ton Gantry Crane
China Industrial Steel Structure Workshop

Prefab Steel Structure in China
China Prefab Steel Structure Building

Features of China Steel Structure

High Strength and Light Weight
Steel has high strength and high elastic modulus. Compared with concrete construction, the ratio of steel structure density to yield strength is relatively low. Therefore, under the same stress conditions, steel structure members have small cross-sections and light weight, which are convenient for transportation and installation and suitable for large-span heavy structures.

High Reliability
The steel has good toughness and plasticity, suitable for bearing impact and dynamic load, and has good seismic performance. The internal structure of the steel is uniform, close to an isotropic homogeneous body. The actual working performance of the steel structure China is more in line with the calculation theory. Therefore, the China steel building has high reliability.

High Degree of Mechanization of Steel Structure Manufacturing
Steel structural components are prefabricated in factories and assembled on site. The finished steel structural components have high precision, high production efficiency, fast assembly speed and short construction period.

Good Sealing Performance
Because the welded steel structure can be completely sealed, it can be made into high-pressure vessels, large oil pools, pressure pipes, etc. with good air and water tightness.

Heat Resistance
When the temperature is below 150°C, the properties of the steel change little. Therefore, the steel structure is suitable for hot workshops, but when the surface of the structure is exposed to heat radiation of about 150 ℃, it should be protected by heat insulation board.

In buildings with special fire protection requirements, the steel structure must be protected by refractory materials to improve the fire resistance level.

Energy-saving And Environmentally Friendly
The wall adopts C-shaped steel, square steel tube, and color steel sandwich panels that are light weight, environmentally friendly and energy-saving, with good thermal insulation performance and good seismic resistance. It can save energy by 50%.

The demolition of China steel structure buildings hardly produces construction waste, and steel can be recycled and reused.

China Steel Structure Design

Specifications

The following specifications apply to single-story steel construction building:

  • Overall length: depending on your requirements
  • Column spacing: 6m, 7.5m, 9m, 12m, or customized
  • Span: 9-36m (take a multiple of 3m). Single span, double span and multi-span are available.
  • Height (without installing an overhead bridge crane): 4.5-9m
  • Height (installing overhead crane and runway systems): determined by the desired specifications of the crane, such as rated load capacity and lifting height.
  • Other requirements: wall and roof insulation
  • Note: the China cost of steel structure building does not include the doors and windows.
China Single-story Steel Structure

FAQs

Why Should You Choose Steel Structure?
  • Easy and quick construction.

    All main components of China lightweight steel structure are prefabricated in the factory and then erected at the site.

  • Large span.

    The steel building enables large span to be constructed with small construction depth.

  • Great flexibility.

    The structural steel can be bend without cracking, making it much safer to construct the industrial buildings as compared to concrete.

  • Excellent fire resistance and corrosion resistance.

    The steel in buildings is usually protected from fire or corrosion by wrapping it with boards or spray-on material.

  • High adaptability.

    The structure can be easily re-designed in future, such as to modify, strengthen and extend the building.

  • High utilization.

    The steel can be recycled and reused without losing its quality and strength.

What Are The Components of Steel Structure?

Primary components: steel columns, steel beams, wind-resistant columns and runway beams.

Secondary components: purlins (C-shaped, Z-shaped), purlin braces, horizontal and vertical bracing systems.

Building envelop: color steel tile, color steel sandwich panel.

Which Connection Is Used In China Structural Steel Construction?

All the main components of steel structures China are pre-engineered in the manufacturer’s factory, including pre-punched, pre-drilled and pre-welded, and then connected and set up at customer site. There are several different ways to connect the structural steel, including:

  • Welding: automatic operation without weakening the cross section, good tightness at the joint and high structural rigidity
  • Riveting: easy to check, excellent resistance to dynamic change
  • Ordinary bolt connection: easy to assemble and disassemble
  • High-strength bolt connection: good elasticity, large bearing capacity, compact connection
What Are The Common Problems With Steel Structure Construction?

Column Foot Installation Issues:

1. Problems with embedded parts: the overall layout is offset; the elevation is wrong; the threaded fasteners are not protected. This will directly cause the bolt holes of the steel column bottom plate to be misaligned, resulting in insufficient thread length.

Solution: The China industrial steel structure construction unit cooperates with the civil construction unit to complete the embedded parts work. Before the concrete is poured, the relevant dimensions and the fixation must be reviewed.

2. The anchor bolt is not vertical: the horizontal error of the embedded anchor bolt after the foundation construction is too large. After installation, the pillars are not in a straight line, which makes the appearance of the steel building unsightly, brings errors to the installation of the steel columns, and affects the structural forces.

Solution: The anchor bolt installation should first level the bottom plate with the lower adjusting bolt, and then fill it with secondary grouting with non-shrinkage mortar. During anchor construction, fixed anchors such as steel bars or angle steels can be used.

3. Anchor bolt connection issues: the column anchor bolt is not tightened, and the backing plate is not welded to the bottom plate.

Solutions: Welded anchor rods and nuts should be adopted; on the outside of chemical anchor bolts, fireproof paint and heat insulation treatment should be taken to prevent the anchoring performance from being affected in the event of fire.

Connection Issues:

1. High-strength bolt connection issues

The bolt surface does not meet the requirements, causing the bolts to be difficult to install, or the degree of bolt tightening does not meet the design requirements. This may be caused by impurities such as floating rust and oil stains on the surface of the bolts, and burrs and weld bumps on the bolt holes.

Solution: Floating rust, oil stains and bolt hole defects on the surface of high-strength bolts should be cleaned up one by one. Before use, it must be treated with rust prevention. The bolts used for trial assembly must not be used during formal assembly. The bolts should be kept and distributed by special personnel.

2. The bolt thread is damaged, and the screw cannot be screwed into the nut freely, which affects the assembly of the bolt. This may be due to severe corrosion of the thread.

Solutions:

  • Bolts should be carefully selected, and pre-assembled after cleaning and derusting.
  • Thread damaged bolts cannot be used as temporary bolts, and it is strictly forbidden to force them into the screw holes.
  • The pre-selected bolt components should be stored in sets and cannot be interchanged during use.

On-site Welding Issue:

It is difficult to guarantee the quality of on-site welds; the first and second level welds with design requirements for full penetration are not used for ultrasonic flaw detection; the main beams and columns on the floor are not welded; and the pilot arc plate is not used for welding.

Solutions:

  • Before welding the China steel frame structure, check the qualification certificate of the welding rod, select the welding rod according to the design requirements, and use it according to the instructions and operating procedures.
  • There should be no cracks or weld bead on the surface of the weld.
  • The first and second level welds must not have pores, slag inclusions, arc pit cracks, and the first level welds must not have defects such as undercuts and underfills.
  • The first and second level welds shall be subjected to non-destructive testing as required, and the welder’s steel seal shall be inspected at the specified welds and positions.

Deformation of Components:

1. The components are deformed during transportation, and there are dead or slow bends, causing the components unable to be installed.

  • The deformation caused by welding during the production of the component generally produces a slow bend.
  • When the components are to be transported, the supporting points are unreasonable, causing dead bends or slow deformation of the components.
  • Deformation caused by collision during component transportation usually generates dead bends.

Precaution:

  • When components are made, reduce welding deformation.
  • The assembly sequence should obey the welding sequence, use assembly molds, and set enough brackets to prevent deformation.
  • Pay attention to the reasonable allocation of pads during transportation.

Solutions:

  • The dead bending and deformation of components are generally treated by mechanical correction method. That is to use jacks or other tools to correct or correct after oxyacetylene flame roasting.
  • When the structure undergoes slow bending deformation, oxyacetylene flame heating is used for correction.

2. The component is arched, and the value is larger or smaller than the design value. If the arching value of the component is small, the beam will bend down after installation; when the arching value is large, the extruded surface elevation is likely to exceed the standard.

Reasons:

  • The size of the component does not meet the design requirements.
  • During the erection process, no correction was made based on the discrepancy between the actual measured value and the calculated value.
  • For bridges with small spans, the degree of camber is small, so they are ignored during assembly.

Solutions:

  • Inspect strictly according to the allowable deviation of the steel structure.
  • After the rods are installed and the construction of the joints is completed, the camber must be measured and adjusted during the construction.
  • In the small-span assembly process, the accumulated deviation should be strictly controlled, and measures should be taken to eliminate the influence of welding shrinkage.

Trusted Steel Structure Building Manufacturer in China

Aicrane is a reputable China steel structure manufacturer and supplier which can help you design and fabricate your facilities, and at the same time, save time, money and efforts for you. Here are several reasons why you should choose us:

  • Superior quality. The building is constructed with high quality steel. All components all fabricated under strict control in our factory.
  • Reasonable cost. The steel structure supplied by our company is competitively priced to reduce costs for you.
  • Custom design. Backed by professional engineers, we are able to custom design the building based on your specific requirements.
  • After-sales service. The company has a professional after-sales service team with over 60 engineers for fast and high-standard after-sales service. We can offer installation, maintenance and free technical advice to our clients. We supply lifelong service support.
  • Overseas offices. We have set up overseas offices in the Philippines, Malaysia, Indonesia, Pakistan and Uzbekistan to provide customers with better and faster services.

If you want to know more about China steel structure, contact us today!

    Customize Your Lifting Solutions

    Contact us now via email: inquiry15@aicranes.com, or fill in the form below.

    FEW TIPS:

    1.Applications: ?

    2.Building dimension (L*W*H): ?

    3.Overhead crane capacity if any(t): ?

    4.Project introduction: project working site, project budget, etc.